Details of each of our subsidiaries are
Nyamingura Power Station was the first scheme we built. It is a 1.1MW project utilising water from the Nyamingura and Madengwe rivers.
Read moreThe Duru Power Station was built in 2012 and commissioned in March 2013. It is a 2.2MW scheme, taking water from the Duru river.
Read moreThe Pungwe A Power Station was built in 2011 and 2012. It is a 2.725MW scheme, taking water from the Nyamombe tributary of the Pungwe river.
Read moreThe Pungwe B scheme was commissioned at the start of February 2015 and is now fully operational. Started in 2013, it took 19 months to build. It is a 15MW scheme taking water from the Pungwe River.
Read moreThe Pungwe C Power Station was commissioned in March 2016. It is a 3.75 MW scheme, taking water from a weir on the Chiteme river which is a tributary of the Pungwe river.
Read moreThe Hauna Power Station scheme was commissioned in January 2017. It is a 2.3 MW scheme, taking water from the Ngarura river, which is a tributary of the Honde river.
Read moreThe Riverside Solar Power Station was commissioned in January 2018. It is aa 2.5 MW scheme at Mutoko in Zimbabwe.